Wednesday, November 10, 2010

Ashley 11/10/10

 You can see how thick the cement is and the size of the rerod
 A few pictures to follow showing how the tanks get hoisted into the containment.  12 tanks to be set today.





Panorama of the site.

Tuesday, November 9, 2010

Ashley 11/9/10

Lots of Cement
Office Area

Office Area - Equipment storage behind
 
Excavating for West Driveway

West Driveway
 Ready to pour South of Containment - Pump truck allows for fast pours
 Bollards to protect power guy wires

 Flagpole base for 50 foot pole 10x15 flag
 Sign Footings installed
Overall Site view.

Tuesday, November 2, 2010

Ashley 11/2/10

Things are going quite well up at Ashley.  We are expecting all of the cement to be poured in the building this week.  That will get us in good shape to have the building going up by the end of the month.  We also expect the meter to be operational for rail and truck loading this week.  Look for more tank setting next week.
 Cement Finished north of containment. 
 All Cement Adjacent to west side of building complete.  Load pad installed.
 Bollards to protect gas, electric, & tower.
 Prepping for west side drives
Plumbing & Electrtical rough in complete and inspected.  Insulation going down for floor heat.  Pex tubing for floor heat will be installed today.

Thursday, October 28, 2010

Wednesday, October 27, 2010

Ashley 10/27/10

 Plant & Loadout area nearly ready for cement
 Office area plumbing rough in - Chasco says that there will be 2 miles of tubing for the floor heat in the office and storage area.
 Warehouse Cement
Truck Loadout pad ready to pour in the morning.

Thursday, October 21, 2010

Ashley 10/21/10

 It was a wet week causing probably not as much progress as was hoped for.  This area was prepped for the truck unloading pad.
 Much work was done stabilizing the area west of the containment.

 Temporary power is nearly complete for the meter to be used in the new building

More warehouse cement was poured last Thursday.  Looks like a big warehouse.
 Underground raceways are being installed.  There are several pictures here showing the process.  It is quite time consuming.



 Office area has been brought up to grade.
Gas service is installed on building.  Waterline can also be seen (black stand pipe).

Williams 10/20/10

 
I had the chance to visit Williams this week, looking for opportunities to  upgrade the existing containment.  It was good to see everyone there and see as always, how smoothly things run.  There was very little distribution equipment on site, meaning that the wheels are turning getting product delivered.