You can see how thick the cement is and the size of the rerod
A few pictures to follow showing how the tanks get hoisted into the containment. 12 tanks to be set today.
Panorama of the site.
Wednesday, November 10, 2010
Tuesday, November 9, 2010
Ashley 11/9/10
Tuesday, November 2, 2010
Ashley 11/2/10
Things are going quite well up at Ashley. We are expecting all of the cement to be poured in the building this week. That will get us in good shape to have the building going up by the end of the month. We also expect the meter to be operational for rail and truck loading this week. Look for more tank setting next week.
Cement Finished north of containment. All Cement Adjacent to west side of building complete. Load pad installed.
Bollards to protect gas, electric, & tower.
Prepping for west side drives
Plumbing & Electrtical rough in complete and inspected. Insulation going down for floor heat. Pex tubing for floor heat will be installed today.
Thursday, October 28, 2010
Wednesday, October 27, 2010
Ashley 10/27/10
Plant & Loadout area nearly ready for cement
Office area plumbing rough in - Chasco says that there will be 2 miles of tubing for the floor heat in the office and storage area.
Warehouse Cement
Truck Loadout pad ready to pour in the morning.
Office area plumbing rough in - Chasco says that there will be 2 miles of tubing for the floor heat in the office and storage area.
Warehouse Cement
Truck Loadout pad ready to pour in the morning.
Thursday, October 21, 2010
Ashley 10/21/10
It was a wet week causing probably not as much progress as was hoped for. This area was prepped for the truck unloading pad.
Much work was done stabilizing the area west of the containment.
Temporary power is nearly complete for the meter to be used in the new building
More warehouse cement was poured last Thursday. Looks like a big warehouse.
Underground raceways are being installed. There are several pictures here showing the process. It is quite time consuming.
Office area has been brought up to grade.
Gas service is installed on building. Waterline can also be seen (black stand pipe).
Much work was done stabilizing the area west of the containment.
Temporary power is nearly complete for the meter to be used in the new building
More warehouse cement was poured last Thursday. Looks like a big warehouse.
Underground raceways are being installed. There are several pictures here showing the process. It is quite time consuming.
Office area has been brought up to grade.
Gas service is installed on building. Waterline can also be seen (black stand pipe).
Williams 10/20/10
I had the chance to visit Williams this week, looking for opportunities to upgrade the existing containment. It was good to see everyone there and see as always, how smoothly things run. There was very little distribution equipment on site, meaning that the wheels are turning getting product delivered.