Tuesday, January 24, 2012

All 3 Tanks Standing at Goodland

The exterior of the third was completed last week.
 
Over the last days the surrounding area has been cleaned up and dirt piles leveled. Dry inspections has begun on the interior liner with full capacity water testing soon to follow.  
Updated view driving down main street Goodland 

Monday, January 16, 2012

Interior Liner Installation

Tank 1 liner installation began last week.
Protecting the liner floor from the concrete foundation a layer of felt is sandwiched between to avoid any abrasions due to friction.



 View of the tanks from the street entrance

Monday, January 9, 2012

Update from Goodland

Progress is really taking shape at the Goodland site on the 500,000 gallon tank project. 

The first tank has all its rings applied, with the second about half way there.


Below shows a glimps all the summer tourist drawn to Goodland will view while walking the historic brick streets of downtown.