Tuesday, December 14, 2010

ASHLEY UPDATE 12/14/10

Below are some pictures of them putting up the 4th truss. There are 2 cranes and 3 manlifts to get this done.  There are a lot of pieces to go together here.





 2000 AMP Master Electrical disconnect.  It is setting on the tower pad.  It has it's own temperature control system.  Lots of power.

No comments:

Post a Comment