Good things happening this week at Ashley.  I took a couple pictures of the building from the north after coming from a meeting in Ithaca.  We are beginning to start finishing up the site work now that the weather is better.  Next week will bring drainage and excavation for the second rail line.


 You can see to the left that the trees have been cleared between our spur and the main line.
 A shot from the truck loading bay toward the office.
 Racking on site to be assembled for packaged material storage
Rail spur drainage to happen this week.  Excavation for the second spur can then begin.  Looks very different with all of the trees removed.