Tuesday, October 4, 2011

Kansas Progress

The pier drilling company set up there test this morning to check the load test on the individual pier. They drilled and installed 4 piers (2 on each side) of the actual test pier  (center). After setting for a week they installed a pressure test apparatus over the center pier and applied pressure (up to 100 ton) to check for stability.
 They Passed.