FOR THE PAST WEEK THE EXCAVATORS HAVE BEEN, YOU KNOW THE SAYING DIG A HOLE THEN FILL IT BACK IN. WELL THAT IS PRETTY MUCH WHAT HAS BEEN HAPPENING BUT THIS TIME IT IS IN A PRODUCTIVE MANNER.


FROM THE RESULT OF THE GEO-TECH BORING THE SOILS FOR EACH HALF MILLON GALLON TANK WAS REQUIRED TO BE REMOVED 12 FEET IN DEPTH THEN REBUILT BACK UP WITH THE CORRECT LAYERS OF SOILS, STONE AND COMPACTION.

THIS SERIES OF PICTURES SHOW THAT PROCESS IN STAGES. 




THE NEXT STEP TO BE TAKEN IS A STEEL RING FILLED WITH STONE PLACED ATOP OF THESE LAYERS THAT WILL ACT AS THE TANKS BASE FOUNDATION.