Thursday, November 3, 2011

New project begins in Ashley

This week work began at the Ashley site preparing for 3- 500,000 gallon tanks to be installed spring 2012. Trench was dug that runs to the 3 tanks for the muliple lines to supply fertilizer, electric , air and water hydrant.



LIQUID's Ron Andrews and Randy Harris work at installing the electrical service to each tank. Also able to see sections of 4" stainless lines welded and placed. Once all welds are complete a pressure test will take place checking for leaks.  

Also in this project a rail manifold will be constructed. The pads seen running along the spur will support the piping, in all the trunk line will span 600 feet reaching 10 cars.     


Crew from Two Guy's Mechanical are preforming the welding fabrication. Excavating by Miller and Son's. 

No comments:

Post a Comment