Here can be seen the coming together of the overall
structure as the Heritage Museum on the left meets up to the primary office
wing on the right.
Over the next few photos give a glance to the eye-catching beams
selected as the framing to create the Heritage Museum.
Perspective view to the framing that will signify as the exterior
visual trademark, framing represents a two story glass silo that at floor level
will be home to a library, a walking bridge coming from the second floor of the
interior offices will lead out to an observation area overlooking the upper section.
Various views of the exterior construction.
One of the two ponds anchoring the main entrance to the new complex.
Along with adding visual appeal they will
also perform as watershed collection areas for the entire site.
Next week begins pouring of 2nd floor concrete, over all the interior surface will recieve 58,000 sq. ft. of concrete. We will keep our fingers crossed the weather continues to bless the project.