Progress in Williams and Stockton

Williams
 
 The west end or exit side of the new 60x100 load out building.
 
 The rail office is looking  more like a shanty than an office at this time.
 
We now have an enclosed building. It took a while but the wind finally died down enough and gave the crew an opportunity to finish the fabric roof. If you look close you can see a daring individual on the peak.


Stockton
 

The south wall of the load out building was poured last week. As you can see, the weather is still working in our favor.

 The raceway walls leading from the building to the rail office were poured last week as well.

 Here you see the raceway after the interior forms have been stripped.

This is an exterior doorway that leads into the electrical room. You can see the panels on the right. The one under the tarp is the main service panel to accomodate the upgraded 1000 amp service.

Prep work is complete for the last of the concrete in the load out building. The 60x120 area you see here was poured this week. I don't have a picture of the finish product yet.

Stay tuned - we're getting close to the end.